Cladding Remediation Services Across Kent

Recladding Kent

Improving the safety and long-term performance of external façades has become a priority for building owners throughout Kent.

From Maidstone and Ashford to Canterbury and Dartford, our team supports housing providers, private landlords, and commercial clients with fully compliant recladding solutions. Through our in-house expertise we are able to manage the full recladding project lifecycle from inception to completion. Taking the role of either principle contractor or subcontractor our cladding remediation solutions focus on compliance, quality and cost control.

 

Every project is managed with a practical, hands-on approach: clear fire-safety guidance, accurate diagnostic reporting, transparent costs, and quality workmanship delivered by a specialist façade remediation team.

Whether the issue involves outdated ACM panels, failed insulation systems or general deterioration, we provide a complete service from investigation to sign-off.

Cladding Condition Surveys & Defect Investigations

Cladding Condition Surveys & Defect Investigations

A thorough understanding of the building envelope is essential before any recladding work begins. Our survey teams conduct detailed cladding inspections across Kent, examining fire barriers, cavities, insulation layers, and material performance.

Each assessment is produced with photographic evidence, risk categorisation, and recommended actions, giving property owners a clear roadmap for bringing their building up to modern fire-safety and compliance standards.

Fire-Safe Recladding Design & Specification

Fire-Safe Recladding Design & Specification

Once the investigation is complete, we prepare a replacement cladding specification tailored to the building’s structural design, exposure level and required fire rating.

Our designers consider Kent’s environmental conditions, coastal weathering (particularly in towns like Dover, Whitstable and Margate), and architectural restrictions. All proposed systems are compliant with the latest MHCLG and Building Regulations requirements.

Removal of Non-Compliant or Failing Cladding Systems

Removal of Non-Compliant or Failing Cladding Systems

We manage the controlled removal of unsafe or deteriorated façade materials, ensuring minimal disruption to residents or businesses.

Our Kent remediation teams follow strict safety procedures, with every stage documented for regulator and warranty provider review. Waste materials are handled responsibly and disposed of through licensed facilities.

Installation of Fully Compliant Replacement Cladding Systems

Installation of Fully Compliant Replacement Cladding Systems

We deliver complete recladding installations using fire-rated materials from accredited suppliers.

Typical systems include:

  • A1/A2 fire-rated rainscreen panels
  • High-performance insulation systems
  • Correctly installed cavity barriers
  • Updated fixings and support frameworks

Our installation teams work across Kent daily, maintaining predictable timescales and clear communication from start to finish.

Kent-Based Fire Testing, Building Control & Regulatory Oversight

Kent-Based Fire Testing, Building Control & Regulatory Oversight

All projects are monitored by independent, qualified fire safety specialists to ensure every detail meets statutory requirements.

These specialists are brought in early, during design approval, to review materials and confirm compliance before construction begins. They also attend site at key stages, carrying out inspections and sign-offs that form part of the final project record.

EWS1 Support & Final Certification for Kent Buildings

EWS1 Support & Final Certification for Kent Buildings

Once the recladding works are completed, our appointed regulatory partners issue the relevant certification, including EWS1 ratings where applicable.

This provides residents, lenders and insurers with verified assurance that the building meets current fire-safety standards and has been remediated using compliant systems.

A thorough understanding of the building envelope is essential before any recladding work begins. Our survey teams conduct detailed cladding inspections across Kent, examining fire barriers, cavities, insulation layers, and material performance.

Each assessment is produced with photographic evidence, risk categorisation, and recommended actions, giving property owners a clear roadmap for bringing their building up to modern fire-safety and compliance standards.

Once the investigation is complete, we prepare a replacement cladding specification tailored to the building’s structural design, exposure level and required fire rating.

Our designers consider Kent’s environmental conditions, coastal weathering (particularly in towns like Dover, Whitstable and Margate), and architectural restrictions. All proposed systems are compliant with the latest MHCLG and Building Regulations requirements.

We manage the controlled removal of unsafe or deteriorated façade materials, ensuring minimal disruption to residents or businesses.

Our Kent remediation teams follow strict safety procedures, with every stage documented for regulator and warranty provider review. Waste materials are handled responsibly and disposed of through licensed facilities.

We deliver complete recladding installations using fire-rated materials from accredited suppliers.

Typical systems include:

  • A1/A2 fire-rated rainscreen panels
  • High-performance insulation systems
  • Correctly installed cavity barriers
  • Updated fixings and support frameworks

Our installation teams work across Kent daily, maintaining predictable timescales and clear communication from start to finish.

All projects are monitored by independent, qualified fire safety specialists to ensure every detail meets statutory requirements.

These specialists are brought in early, during design approval, to review materials and confirm compliance before construction begins. They also attend site at key stages, carrying out inspections and sign-offs that form part of the final project record.

Once the recladding works are completed, our appointed regulatory partners issue the relevant certification, including EWS1 ratings where applicable.

This provides residents, lenders and insurers with verified assurance that the building meets current fire-safety standards and has been remediated using compliant systems.

Case Studies

WHERE DESIGN MEETS QUALITY

West End Gate
The Residences Buildings, Marylebone, W2
Twelve Trees Park (Phase 1A)
West Ham, E16
Royal Eden Dock
Newham, E16
  • Client

    Berkeley Group

  • Main Contractor

    St William Homes

  • Contract Value

    £7.25m

  • Project Duration

    144 weeks

VIEW PROJECT
Poplar Riverside
Poplar, London E14
  • Client

    Mount Anvil

  • Main Contractor

    Mount Anvil

  • Contract Value

    £9.6m

  • Project Duration

    1) Block A and G – 52 weeks 2) Block B1 and B4 – 57 weeks

VIEW PROJECT
Friary Park
Acton, London W3
West Byfleet
Broadoaks Estate, Surrey KT14
  • Client

    Pellings LLP

  • Main Contractor

    OCL Reclad Limited

  • Contract Value

    £7m

  • Project Duration

    80 weeks

VIEW PROJECT
Angel Wharf
Hackney, London N1
  • Client

    Bellway Homes

  • Main Contractor

    OCL Reclad Limited

  • Contract Value

    £1.3m

  • Project Duration

    30 weeks

VIEW PROJECT
Quadrangle
Wandsworth, London SW17
  • CLIENT

    Mount Anvil

  • Main Contractor

    Main Contractor

  • Contract Value

    £8.5m

  • Project Duration

    82 weeks

VIEW PROJECT
Filaments
Wandsworth, London SW18
  • CLIENT

    Vistry Group

  • Main Contractor

    Vistry

  • Contract Value

    £23M

  • Project Duration

    110 weeks

VIEW PROJECT
Blackhorse Mills
Ferry Lane, E17 London
VIEW ALL PROJECTS

Like what you’ve seen?
Please get in contact to find out more.

CONTACT US